STUDIO
Follow Us

Terms of Use Privacy Policy

Pipe Fusion

Sewer foreman Kenneth Robertson, left, and Director of Operation for El Dorado Water Utilities Buddy Kinney, right, tighten clamps on two 40-foot long high-density polyethylene (HDPE) pipes before the ends are fused together. Once finished, the 840 foot pipe will be buried along South Washington Avenue replacing older sewer lines.

Source: Eldorado news

Top Trending Videos